top of page

CCNA LAB v.1.1 : 802.1Q Trunking, Native VLAN & LACP | Update 17 February 2025
Tasks All physical cabling is in place and verified. Switch SW-1 is pre-configured and inaccessible. SW-2 and SW-3 ports must be...
10

CCNA LAB v.1.1 : 802.1Q Trunking & LACP | Update 17 February 2025
Tasks Task 1. Configure the trunks between SW1 and Sw2 on ports E0/0 and E0/1 using the IEEE standard frame tagging method. + Only the...
30

CCNA LAB v.1.1 : VLAN & CDP Sim 2 | Update 17 February 2025
Tasks All physical cabling is in place and verified. Connectivity for PC1, PC2 and PC3 must be established to the switches. Each port...
40

CCNA LAB v.1.1 : Allowed, Native VLAN & LACP Sim 2 | Update 30 September 2024
Tasks All physical cabling is in place and verified. Connectivity between all four switches must be established and operational. All...
1770

CCNA LAB v.1.1 : VLAN Configuration Sim | Update 30 September 2024
Tasks All physical cabling is in place and verified. Connectivity for the Switches on ports E0/1, E0/2, and E0/3 must be configured and...
950

CCNA LAB v.1.1 : Trunking & LACP Sim | Update 30 September 2024
Tasks Task 1. Configure trunks between Sw1 and Sw2 on ports E0/0 and E0/1 using the IEEE standard frame tagging method. – Add VLAN 45 as...
430

CCNA LAB v.1.1 : VLAN CDP & LLDP Sim | Update 30 September 2024
Tasks R1 and R2 are pre-configured with all the necessary commands. All physical cabling is in place and verified. Connectivity for PC1...
310

CCNA LAB : ISL Trunking and LACP Sim | Update 30 September 2024
Tasks VLANS 35 and 45 have been configured in all three switches. All physical connectivity has been installed and verified. All...
290

CCNA LAB : VLAN & CDP Sim 2 | Update 29 May 2024
Tasks All physical cabling is in place and verified. Connectivity for PC1, PC2 and PC3 must be established to the switches. Each port...
1620

CCNA LAB : Allowed, Native VLAN & LACP Sim | Update 29 May 2024
Tasks All physical cabling is in place and verified. Router R1 is configured and passing traffic for VLANs 5 and 6. All relevant ports...
720

CCNA LAB : Voice VLAN & LLDP Sim | Update 29 May 2024
Tasks All physical cabling is in place and verified. Connectivity for the Switches on ports E0/1, E0/2, and E0/3 must be configured and...
590

CCNA LAB : Voice VLAN Configuration Sim 2 | Update 8 February 2024
Tasks R1 has been pre-configured with all the necessary commands. All physical cabling is in place and verified. Connectivity to the end...
1060

CCNA LAB : VLAN & LLDP Sim | Update 8 February 2024
Tasks R1 has been pre-configured with all the necessary commands. All physical cabling is in place and verified. Connectivity for PC1 and...
400

CCNA LAB : VLAN CDP & LLDP Sim | Update 8 February 2024
Tasks R1 and R2 are pre-configured with all the necessary commands. All physical cabling is in place and verified. Connectivity for PC1...
340

CCNA LAB : VLAN and CDP Sim | Update 8 February 2024
Tasks R1 has been pre-configured with all the necessary commands. All physical cabling is in place and verified. Connectivity from PC1,...
400

ENCOR LAB : Trunk UDLD & LACP Sim | Update 31 January 2024
Tasks The operations team started configuring network devices for a new site. Complete the configurations to achieve these goals: 1. The...
640

ENCOR LAB : Rapid PVST+ and LACP Sim | Update 31 January 2024
Tasks The operations team started configuring network devices for a new site. Complete the configurations to achieve these goals: 1....
370

CCNA LAB : VLAN and Trunking Configuration Simulate | Update 3 พ.ค.2023
Guidelines This is a lab item in which tasks will be performed on virtual devices. + Refer to the Tasks tab to view the tasks for this...
590

CCNA LAB : Voice VLAN Configuration Simulate | Update 3 พ.ค.2023
Guidelines This is a lab item in which tasks will be performed on virtual devices. + Refer to the Tasks tab to view the tasks for this...
630
ENCOR Questions – Part 2-1 | Update 24 ก.พ.2021 | 54Q
Question 1 Drag and drop the solutions that comprise Cisco Cyber Threat Defense from the left onto the objectives they accomplish on the...
1020
bottom of page