top of page

CCNA LAB v.1.1 : Static Routing Configuration Sim 5 | Update 17 February 2025
Tasks Task 1 + Configure a host route on R5 for the destination of 10.200.220.6. + Configure a static default route on R1 preferring the...
10

CCNA LAB v.1.1 : 802.1Q Trunking, Native VLAN & LACP | Update 17 February 2025
Tasks All physical cabling is in place and verified. Switch SW-1 is pre-configured and inaccessible. SW-2 and SW-3 ports must be...
10

CCNA LAB v.1.1 : IPv4 and IPv6 Assignment Sim 2 | Update 17 February 2025
Tasks Configure IPv4 and IPv6 between two routers. IPv4 Subnet IPv6 Subnet 192.168.168.192/28 2001:db8:12::60/125 Task 1: + Configure...
10

CCNA LAB v.1.1 : 802.1Q Trunking & LACP | Update 17 February 2025
Tasks Task 1. Configure the trunks between SW1 and Sw2 on ports E0/0 and E0/1 using the IEEE standard frame tagging method. + Only the...
30

CCNA LAB v.1.1 : VLAN & CDP Sim 2 | Update 17 February 2025
Tasks All physical cabling is in place and verified. Connectivity for PC1, PC2 and PC3 must be established to the switches. Each port...
40

CCNA LAB v.1.1 : VLAN Configuration Sim | Update 30 September 2024
Tasks All physical cabling is in place and verified. Connectivity for the Switches on ports E0/1, E0/2, and E0/3 must be configured and...
950

CCNA LAB v.1.1 : Trunking & LACP Sim | Update 30 September 2024
Tasks Task 1. Configure trunks between Sw1 and Sw2 on ports E0/0 and E0/1 using the IEEE standard frame tagging method. – Add VLAN 45 as...
430

CCNA LAB v.1.1 : OSPF Configuration Sim 3 | Update 30 September 2024
Tasks Refer to the topology. All physical cabling is in place. Routers 2 and 3 are inaccessible. Configure OSPF routing for the network...
420

CCNA LAB v.1.1 : OSPF Configuration Sim 2 | Update 30 September 2024
Tasks Task 1. Configure OSPF Area 0 with Process ID 110 on all devices under their respective interfaces connected to VLAN101. To...
380

CCNA LAB v.1.1 : IPv4 and IPv6 Assignment Sim | Update 30 September 2024
Tasks Reference Topology Diagram and table. Configure IPv4 and IPv6 between the two routers. Task 1: + Configure R1 with the first ...
610

CCNA LAB : ISL Trunking and LACP Sim | Update 30 September 2024
Tasks VLANS 35 and 45 have been configured in all three switches. All physical connectivity has been installed and verified. All...
290

CCNA LAB : Static Routing Configuration Sim 5 | Update 30 September 2024
Tasks Task 1 + Configure a host route on R5 for the destination of 10.200.220.6. + Configure a static default route on R1 preferring the...
370

ENARSI LAB : Access-list Sim (Draft Version)| Update 19 August 2024
Topology Tasks Tasks 1. SW2 should only allow telnet access from ISP router’s Loopback 0 interface. Tasks 2. ISP will only allow major...
170

ENARSI LAB : IPSec Configuration Sim 2 | Update 19 August 2024
Topology Tasks Configure IPSec security policy on tunnel interfaces to ensure data confidentiality and integrity where mGRE tunnels are...
170

ENARSI LAB : IPSec Configuration Sim | Update 19 August 2024
Topology Tasks Configure IPSec security policy on tunnel interfaces to ensure data confidentiality and integrity where mGRE tunnels are...
180

CCNA LAB : VLAN & CDP Sim 2 | Update 29 May 2024
Tasks All physical cabling is in place and verified. Connectivity for PC1, PC2 and PC3 must be established to the switches. Each port...
1620

ENCOR LAB : NetFlow Sim 2 | Update 4 May 2024
Tasks The Operations team started configuring several monitoring activities. Complete the configurations for the tasks below. 1. Enable...
550

ENCOR LAB : OSPF Advertised & Summarized Sim | Update 2 May 2024
Tasks OSPF is partially configured. Complete the OSPF configurations to achieve these goals: 1. Configure OSPF on router R1 according to...
580

ENCOR LAB : Trunk UDLD & LACP Sim | Update 31 January 2024
Tasks The operations team started configuring network devices for a new site. Complete the configurations to achieve these goals: 1. The...
640

ENCOR LAB : Rapid PVST+ and LACP Sim | Update 31 January 2024
Tasks The operations team started configuring network devices for a new site. Complete the configurations to achieve these goals: 1....
370
bottom of page